Power by county
Henderson, IL: data center power outlook
Henderson, Illinois is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Henderson carries 7 mapped substations within its boundary, and the highest reachable grid access is 69 kV. Service in Henderson spans 6 utilities, with ACCESS ENERGY COOP, AMEREN ILLINOIS COMPANY, EASTERN IOWA LIGHT & POWER COOP among those mapped.
Grid position at a glance
- Serving utilities
- ACCESS ENERGY COOP, AMEREN ILLINOIS COMPANY, EASTERN IOWA LIGHT & POWER COOP, INTERSTATE POWER AND LIGHT CO, MCDONOUGH POWER COOP, WESTERN ILLINOIS ELEC COOP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 69 kV
- Substations in county
- 7
- Industrial retail rate
- 10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 6 serving utilities: 1.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 11 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 27,201 employed in construction within ~120 km (31 of 32 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Henderson
The material below frames Henderson, Illinois for a prospective large load, drawing only on public sources. At 69 kV, the strongest mapped access in Henderson is sub-transmission class. The mapped layer places 7 substations across Henderson, a moderate density.
Interconnection over Henderson runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Henderson, the rate shown is the state industrial average of 10.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Henderson that report an industrial rate span 1 of 6 serving utilities: 1.6¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Henderson, Illinois carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Henderson, Illinois has no EIA-860M generation on file, which reads as zero rather than as a gap. Henderson sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Henderson withdrew 10.74 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 27,201 people are employed in construction within a 120 km commute of Henderson (BLS QCEW), which frames staffing distance rather than free labour.
For Henderson, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Henderson, Illinois describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Henderson, Illinois, a specific address needs its own interconnection study, which this page does not attempt. The figures for Henderson, Illinois refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.