Power by county
Bureau, IL: data center power outlook
Bureau sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Bureau, Illinois, drawn from public datasets. Counting from the mapped infrastructure, Bureau holds 16 mapped substations and reaches 138 kV. Bureau is covered by 6 retail service territories, including AMEREN ILLINOIS COMPANY, CITY OF PERU - (IL), CITY OF PRINCETON - (IL).
Grid position at a glance
- Serving utilities
- AMEREN ILLINOIS COMPANY, CITY OF PERU - (IL), CITY OF PRINCETON - (IL), COMMONWEALTH EDISON CO, CORN BELT ENERGY CORPORATION, VILLAGE OF LADD - (IL)
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 138 kV
- Substations in county
- 16
- Industrial retail rate
- 10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 1.6 to 9.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 2 projects, 347 MW
- Proposed generation
- 17 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 10 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 55,152 employed in construction within ~120 km (27 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bureau
Everything here about Bureau, Illinois comes from public federal and state records, with the gaps left visible. Bureau reaches 138 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 16 substations mapped, Bureau has a moderate spread of interconnection points.
Bureau falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Bureau is the 10.1 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Bureau, reported per-utility industrial rates cover 4 of 6 serving utilities: 1.6 to 9.6¢/kWh, offered only as context beneath the state figure.
Bureau has 2 interconnection-queue projects on record, totalling 347.2 MW of requested capacity. Bureau has 16.5 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Bureau carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Bureau are 10.02 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Bureau, some 55,152 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Bureau are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Bureau, Illinois together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Bureau, Illinois is an address-level interconnection study; the county figures here only narrow where to look. For Bureau, Illinois, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.