Gooding, Idaho is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Gooding carries 20 mapped substations within its boundary, and the highest reachable grid access is 500 kV. The serving utility mapped across Gooding is IDAHO POWER CO.

Grid position at a glance

Serving utilities
IDAHO POWER CO
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
20
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 serving utility: 8.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
225 lb CO2/MWh
Water withdrawals
1,103 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
8,049 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Gooding

The material below frames Gooding, Idaho for a prospective large load, drawing only on public sources. Grid access in Gooding extends to 500 kV, a high-voltage line class. The mapped layer places 20 substations across Gooding, a moderate density.

Sitting outside any organized market, Gooding, Idaho handles interconnection through its utility rather than a central operator. For Gooding, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Gooding that report an industrial rate span 1 serving utility: 8.1¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Gooding, Idaho carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Gooding, Idaho in EIA-860M as planned or under construction, which counts as a measured zero. Gooding sits under a balancing authority that eGRID puts at 225.071 lb CO2 per MWh.

Gooding withdrew 1,102.54 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 8,049 people are employed in construction within a 120 km commute of Gooding (BLS QCEW), which frames staffing distance rather than free labour.

For Gooding, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Gooding, Idaho describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Gooding, Idaho, a specific address needs its own interconnection study, which this page does not attempt. The figures for Gooding, Idaho refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.