Power by county
Stewart, GA: data center power outlook
Stewart, Georgia is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Stewart carries 7 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Stewart spans 5 utilities, with ALABAMA POWER CO, DIVERSE POWER INCORPORATED, GEORGIA POWER CO among those mapped.
Grid position at a glance
- Serving utilities
- ALABAMA POWER CO, DIVERSE POWER INCORPORATED, GEORGIA POWER CO, SUMTER ELECTRIC MEMBER CORP, TALLAPOOSA RIVER ELEC COOP INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 115 kV
- Substations in county
- 7
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 7.1 to 11.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 1.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 18,517 employed in construction within ~120 km (28 of 37 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Stewart
What follows is a screening-grade read of Stewart, Georgia, built only from named public datasets. At 115 kV, Stewart sits in the transmission class that a large load would look to. The mapped layer places 7 substations across Stewart, a moderate density.
Sitting outside any organized market, Stewart, Georgia handles interconnection through its utility rather than a central operator. For Stewart, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Stewart that report an industrial rate span 3 of 5 serving utilities: 7.1 to 11.4¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Stewart, Georgia carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Stewart, Georgia in EIA-860M as planned or under construction, which counts as a measured zero. Stewart sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.
Stewart withdrew 1.56 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 18,517 people are employed in construction within a 120 km commute of Stewart (BLS QCEW), which frames staffing distance rather than free labour.
For Stewart, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Stewart, Georgia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Stewart, Georgia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Stewart, Georgia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.