Power by county
Putnam, GA: data center power outlook
Putnam, Georgia is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Putnam carries 7 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Putnam spans 5 utilities, with CENTRAL GEORGIA EL MEMBER CORP, GEORGIA POWER CO, RAYLE ELECTRIC MEMBERSHIP CORP among those mapped.
Grid position at a glance
- Serving utilities
- CENTRAL GEORGIA EL MEMBER CORP, GEORGIA POWER CO, RAYLE ELECTRIC MEMBERSHIP CORP, TRI-COUNTY ELEC MEMBER CORP (GA), WASHINGTON ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 7
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 serving utilities: 6.8 to 8.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 186 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 112,992 employed in construction within ~120 km (49 of 54 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Putnam
The material below frames Putnam, Georgia for a prospective large load, drawing only on public sources. Grid access in Putnam extends to 500 kV, a high-voltage line class. The mapped layer places 7 substations across Putnam, a moderate density.
Sitting outside any organized market, Putnam, Georgia handles interconnection through its utility rather than a central operator. For Putnam, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Putnam that report an industrial rate span 5 serving utilities: 6.8 to 8.1¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Putnam, Georgia in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Putnam, Georgia in EIA-860M as planned or under construction, which counts as a measured zero. Putnam sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.
Putnam withdrew 186.02 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 112,992 people are employed in construction within a 120 km commute of Putnam (BLS QCEW), which frames staffing distance rather than free labour.
For Putnam, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Putnam, Georgia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Putnam, Georgia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Putnam, Georgia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.