Irwin, GA: data center power outlook

The grid around Irwin, Georgia is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Irwin the mapped layer shows 4 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Irwin is split among 5 utilities, among them COLQUITT ELECTRIC MEMBERSHIP CORP, CRISP COUNTY POWER COMM, GEORGIA POWER CO.

Grid position at a glance

Serving utilities
COLQUITT ELECTRIC MEMBERSHIP CORP, CRISP COUNTY POWER COMM, GEORGIA POWER CO, IRWIN ELECTRIC MEMBERSHIP CORP, SATILLA RURAL ELEC MEMBER CORPORATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
4
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 5.1 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
17 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
16,028 employed in construction within ~120 km (36 of 42 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Irwin

Read on for the public power picture of Irwin in Georgia, assembled for data center siting. At 500 kV, Irwin carries high-voltage transmission at its strongest mapped point. Across Irwin, Georgia, the mapped layer holds just 4 substations, so options gather at a handful of places.

There is no organized wholesale market over Irwin, Georgia; arrangements run through the serving utility instead. Irwin carries the state industrial average retail rate of 7.8 cents per kWh from EIA-861, applied statewide. For Irwin, the per-utility spread is 4 of 5 serving utilities: 5.1 to 10.8¢/kWh, which qualifies but never replaces the state average.

Irwin, Georgia shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. For Irwin, Georgia, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Irwin shows 842.741 lb CO2 per MWh.

For Irwin, the USGS 2015 compilation records 16.85 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Irwin sits within commuting range of roughly 16,028 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Irwin here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Irwin, Georgia settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Irwin, Georgia requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Irwin, Georgia are logged directly below, so each figure on this page can be traced back to its public dataset.