Echols, Georgia is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Echols carries 4 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Echols spans 6 utilities, with COLQUITT ELECTRIC MEMBERSHIP CORP, DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO among those mapped.
Grid position at a glance
- Serving utilities
- COLQUITT ELECTRIC MEMBERSHIP CORP, DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO, GEORGIA POWER CO, SLASH PINE ELEC MEMBER CORP, SUWANNEE VALLEY ELEC COOP INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 115 kV
- Substations in county
- 4
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 6 serving utilities: 7.1 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 1.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 13,566 employed in construction within ~120 km (27 of 31 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Echols
The material below frames Echols, Georgia for a prospective large load, drawing only on public sources. At 115 kV, Echols sits in the transmission class that a large load would look to. Echols, Georgia carries a thin 4-substation footprint in the mapped layer, concentrating where a connection could land.
Echols, Georgia is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Echols, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Echols that report an industrial rate span 2 of 6 serving utilities: 7.1 to 10.8¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Echols, Georgia in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Echols, Georgia has no EIA-860M generation on file, which reads as zero rather than as a gap. Echols sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.
Echols withdrew 1.87 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 13,566 people are employed in construction within a 120 km commute of Echols (BLS QCEW), which frames staffing distance rather than free labour.
For Echols, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Echols, Georgia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Echols, Georgia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Echols, Georgia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.