Power by county
Clay, GA: data center power outlook
The grid around Clay, Georgia is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Clay the mapped layer shows 1 mapped substation, with grid access reaching 115 kV at its strongest point. Retail service across Clay is split among 5 utilities, among them ALABAMA POWER CO, DIVERSE POWER INCORPORATED, GEORGIA POWER CO.
Grid position at a glance
- Serving utilities
- ALABAMA POWER CO, DIVERSE POWER INCORPORATED, GEORGIA POWER CO, PEA RIVER ELECTRIC COOP, THREE NOTCH ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 115 kV
- Substations in county
- 1
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 7.1 to 20.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 4.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 17,167 employed in construction within ~120 km (24 of 32 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Clay
The sections below set out what public data shows about siting a large electrical load in Clay, Georgia. Transmission-class access reaches 115 kV in Clay at its strongest mapped point. Across Clay, Georgia, the mapped layer holds just 1 substation, so options gather at a handful of places.
Clay, Georgia lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Clay carries the state industrial average retail rate of 7.8 cents per kWh from EIA-861, applied statewide. For Clay, the per-utility spread is 3 of 5 serving utilities: 7.1 to 20.2¢/kWh, which qualifies but never replaces the state average.
For Clay, Georgia, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Clay, Georgia in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Clay shows 842.741 lb CO2 per MWh.
For Clay, the USGS 2015 compilation records 4.22 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Clay sits within commuting range of roughly 17,167 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Clay here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Clay, Georgia settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Clay, Georgia requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Clay, Georgia are logged directly below, so each figure on this page can be traced back to its public dataset.