The grid around St. Johns, Florida is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside St. Johns the mapped layer shows 21 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across St. Johns is split among 6 utilities, among them BEACHES ENERGY SERVICES, CITY OF GREEN COVE SPRINGS, CLAY ELECTRIC COOPERATIVE, INC.

Grid position at a glance

Serving utilities
BEACHES ENERGY SERVICES, CITY OF GREEN COVE SPRINGS, CLAY ELECTRIC COOPERATIVE, INC, DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO, JEA
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
21
Industrial retail rate
8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 6 serving utilities: 6.7 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
597 lb CO2/MWh
Water withdrawals
63 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
86,185 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in St. Johns

The sections below set out what public data shows about siting a large electrical load in St. Johns, Florida. Transmission-class access reaches 230 kV in St. Johns at its strongest mapped point. St. Johns contains 21 mapped substations, a dense footprint that spreads interconnection options across many points.

No organized wholesale market covers St. Johns, Florida, so capacity moves through the local utility and bilateral agreements. St. Johns carries the state industrial average retail rate of 8.8 cents per kWh from EIA-861, applied statewide. For St. Johns, the per-utility spread is 4 of 6 serving utilities: 6.7 to 9.7¢/kWh, which qualifies but never replaces the state average.

St. Johns, Florida shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. The federal EIA-860M inventory files no planned or under-construction generation in St. Johns, Florida, a real zero rather than a gap. In eGRID, the balancing authority over St. Johns shows 597.091 lb CO2 per MWh.

For St. Johns, the USGS 2015 compilation records 62.62 million gallons per day of all-use freshwater withdrawals, not water available to a new load. St. Johns sits within commuting range of roughly 86,185 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for St. Johns here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for St. Johns, Florida settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in St. Johns, Florida requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for St. Johns, Florida are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources