Sarasota, FL: data center power outlook

Sarasota, Florida is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Sarasota carries 34 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Sarasota spans 2 utilities, with FLORIDA POWER & LIGHT CO, PEACE RIVER ELECTRIC COOP, INC among those mapped.

Grid position at a glance

Serving utilities
FLORIDA POWER & LIGHT CO, PEACE RIVER ELECTRIC COOP, INC
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
34
Industrial retail rate
8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 serving utilities: 8.0 to 22.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,208 lb CO2/MWh
Water withdrawals
21 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
174,282 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Sarasota

The material below frames Sarasota, Florida for a prospective large load, drawing only on public sources. At 230 kV, Sarasota sits in the transmission class that a large load would look to. The mapped layer packs 34 substations into Sarasota, a dense spread of options.

Sitting outside any organized market, Sarasota, Florida handles interconnection through its utility rather than a central operator. For Sarasota, the rate shown is the state industrial average of 8.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Sarasota that report an industrial rate span 2 serving utilities: 8.0 to 22.9¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Sarasota, Florida carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M lists nothing planned or under construction for Sarasota, Florida, which is a national filing and so a real zero. Sarasota sits under a balancing authority that eGRID puts at 1,207.833 lb CO2 per MWh.

Sarasota withdrew 21.47 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 174,282 people are employed in construction within a 120 km commute of Sarasota (BLS QCEW), which frames staffing distance rather than free labour.

For Sarasota, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Sarasota, Florida describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Sarasota, Florida, a specific address needs its own interconnection study, which this page does not attempt. The figures for Sarasota, Florida refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.