Okeechobee, FL: data center power outlook

The grid around Okeechobee, Florida is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Okeechobee the mapped layer shows 8 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Okeechobee is split among 5 utilities, among them DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO, GLADES ELECTRIC COOP, INC.

Grid position at a glance

Serving utilities
DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO, GLADES ELECTRIC COOP, INC, PEACE RIVER ELECTRIC COOP, INC, REEDY CREEK IMPROVEMENT DIST
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
8
Industrial retail rate
8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 8.0 to 22.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
149 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
597 lb CO2/MWh
Water withdrawals
20 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
113,700 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Okeechobee

Read on for the public power picture of Okeechobee in Florida, assembled for data center siting. At 500 kV, Okeechobee carries high-voltage transmission at its strongest mapped point. Okeechobee contains 8 mapped substations, a moderate footprint spread across the service area.

Okeechobee, Florida lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Okeechobee carries the state industrial average retail rate of 8.8 cents per kWh from EIA-861, applied statewide. For Okeechobee, the per-utility spread is 4 of 5 serving utilities: 8.0 to 22.9¢/kWh, which qualifies but never replaces the state average.

For Okeechobee, Florida, no queued project appears in the feeds currently covered. In Okeechobee, 149 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Okeechobee shows 597.091 lb CO2 per MWh.

For Okeechobee, the USGS 2015 compilation records 19.67 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Okeechobee sits within commuting range of roughly 113,700 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Okeechobee here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Okeechobee, Florida settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Okeechobee, Florida requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Okeechobee, Florida are logged directly below, so each figure on this page can be traced back to its public dataset.