Power by county
Nassau, FL: data center power outlook
Nassau sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Nassau, Florida, drawn from public datasets. Counting from the mapped infrastructure, Nassau holds 11 mapped substations and reaches 500 kV. Nassau is covered by 6 retail service territories, including BEACHES ENERGY SERVICES, FLORIDA POWER & LIGHT CO, FLORIDA PUBLIC UTILITIES CO.
Grid position at a glance
- Serving utilities
- BEACHES ENERGY SERVICES, FLORIDA POWER & LIGHT CO, FLORIDA PUBLIC UTILITIES CO, GEORGIA POWER CO, JEA, OKEFENOKE RURAL EL MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 11
- Industrial retail rate
- 8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 6.0 to 8.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 597 lb CO2/MWh
- Water withdrawals
- 48 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 66,033 employed in construction within ~120 km (20 of 22 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Nassau
Below, Nassau in Florida is described from public data as a starting point for siting diligence. Nassau reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 11 substations mapped, Nassau has a moderate spread of interconnection points.
Sitting outside any organized market, Nassau, Florida handles interconnection through its utility rather than a central operator. The rate for Nassau is the 8.8 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Nassau, reported per-utility industrial rates cover 3 of 6 serving utilities: 6.0 to 8.0¢/kWh, offered only as context beneath the state figure.
Across the covered feeds, Nassau, Florida carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Nassau, Florida in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Nassau carries a grid carbon intensity of 597.091 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Nassau are 48.14 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Nassau, some 66,033 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Nassau are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Nassau, Florida together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Nassau, Florida is an address-level interconnection study; the county figures here only narrow where to look. For Nassau, Florida, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.