The grid around Lee, Florida is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Lee the mapped layer shows 62 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Lee is split among 3 utilities, among them FLORIDA POWER & LIGHT CO, GLADES ELECTRIC COOP, INC, LEE COUNTY ELECTRIC COOP, INC.

Grid position at a glance

Serving utilities
FLORIDA POWER & LIGHT CO, GLADES ELECTRIC COOP, INC, LEE COUNTY ELECTRIC COOP, INC
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
62
Industrial retail rate
8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 3 serving utilities: 8.0 to 13.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,208 lb CO2/MWh
Water withdrawals
134 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
104,027 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Lee

The sections below set out what public data shows about siting a large electrical load in Lee, Florida. At 500 kV, Lee carries high-voltage transmission at its strongest mapped point. Lee contains 62 mapped substations, a dense footprint that spreads interconnection options across many points.

Lee, Florida lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Lee carries the state industrial average retail rate of 8.8 cents per kWh from EIA-861, applied statewide. For Lee, the per-utility spread is 2 of 3 serving utilities: 8.0 to 13.8¢/kWh, which qualifies but never replaces the state average.

Lee, Florida shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. No generation is filed as planned or under construction in Lee, Florida in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Lee shows 1,207.833 lb CO2 per MWh.

For Lee, the USGS 2015 compilation records 133.92 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Lee sits within commuting range of roughly 104,027 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Lee here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Lee, Florida settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Lee, Florida requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Lee, Florida are logged directly below, so each figure on this page can be traced back to its public dataset.