Bradford, FL: data center power outlook
Bradford, Florida is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Bradford carries 16 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Bradford spans 4 utilities, with CITY OF STARKE - (FL), CLAY ELECTRIC COOPERATIVE, INC, DUKE ENERGY FLORIDA, LLC among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF STARKE - (FL), CLAY ELECTRIC COOPERATIVE, INC, DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 16
- Industrial retail rate
- 8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 4 serving utilities: 6.7 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,208 lb CO2/MWh
- Water withdrawals
- 4.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 75,240 employed in construction within ~120 km (19 of 21 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bradford
The material below frames Bradford, Florida for a prospective large load, drawing only on public sources. At 230 kV, Bradford sits in the transmission class that a large load would look to. The mapped layer places 16 substations across Bradford, a moderate density.
Sitting outside any organized market, Bradford, Florida handles interconnection through its utility rather than a central operator. For Bradford, the rate shown is the state industrial average of 8.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Bradford that report an industrial rate span 3 of 4 serving utilities: 6.7 to 9.7¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Bradford, Florida carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Bradford, Florida in EIA-860M as planned or under construction, which counts as a measured zero. Bradford sits under a balancing authority that eGRID puts at 1,207.833 lb CO2 per MWh.
Bradford withdrew 4.73 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 75,240 people are employed in construction within a 120 km commute of Bradford (BLS QCEW), which frames staffing distance rather than free labour.
For Bradford, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Bradford, Florida describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Bradford, Florida, a specific address needs its own interconnection study, which this page does not attempt. The figures for Bradford, Florida refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.