San Diego, California is served through the CAISO market (California Independent System Operator), and the figures below describe the public grid around a prospective data center site there. San Diego carries 163 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in San Diego spans 5 utilities, with ANZA ELECTRIC COOP INC, IMPERIAL IRRIGATION DISTRICT, SAN DIEGO GAS & ELECTRIC CO among those mapped.
Grid position at a glance
- Serving utilities
- ANZA ELECTRIC COOP INC, IMPERIAL IRRIGATION DISTRICT, SAN DIEGO GAS & ELECTRIC CO, SOUTHERN CALIFORNIA EDISON CO, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- CAISO (California Independent System Operator)
- Highest grid access
- 500 kV
- Substations in county
- 163
- Industrial retail rate
- 21.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 2.9 to 20.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 224 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 369 lb CO2/MWh
- Water withdrawals
- 533 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 272,223 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in San Diego
What follows is a screening-grade read of San Diego, California, built only from named public datasets. Grid access in San Diego extends to 500 kV, a high-voltage line class. The mapped layer packs 163 substations into San Diego, a dense spread of options.
Interconnection over San Diego runs through the CAISO market (California Independent System Operator) and its rules. For San Diego, the rate shown is the state industrial average of 21.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving San Diego that report an industrial rate span 4 of 5 serving utilities: 2.9 to 20.8¢/kWh, shown as context and never as the county rate.
Across the covered feeds, San Diego, California carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M records 224.1 MW planned or under construction for San Diego. San Diego sits under a balancing authority that eGRID puts at 369.346 lb CO2 per MWh.
San Diego withdrew 532.8 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 272,223 people are employed in construction within a 120 km commute of San Diego (BLS QCEW), which frames staffing distance rather than free labour.
For San Diego, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for San Diego, California describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in San Diego, California, a specific address needs its own interconnection study, which this page does not attempt. The figures for San Diego, California refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.