Power by county
Mariposa, CA: data center power outlook
For Mariposa, California, the public grid picture begins with its place in the CAISO market (California Independent System Operator) and the infrastructure mapped inside the county. Grid access across Mariposa tops out at 230 kV, over a footprint of 7 mapped substations. In Mariposa, 5 utilities share the retail territory, among them PACIFIC GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO, TUOLUMNE COUNTY PUB POWER AGNY.
Grid position at a glance
- Serving utilities
- PACIFIC GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO, TUOLUMNE COUNTY PUB POWER AGNY, TURLOCK IRRIGATION DISTRICT, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- CAISO (California Independent System Operator)
- Highest grid access
- 230 kV
- Substations in county
- 7
- Industrial retail rate
- 21.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 2.9 to 21.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 369 lb CO2/MWh
- Water withdrawals
- 20 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 43,176 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Mariposa
For Mariposa, California, the following sections turn public grid records into a siting-oriented summary. The strongest mapped access in Mariposa is 230 kV, squarely transmission class. Mariposa carries 7 substations in the mapped layer, spread across the county.
For Mariposa, the CAISO market (California Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 21.6 cents per kWh, drawn from EIA-861 and applied to Mariposa at the state level rather than as a county rate. The serving utilities in Mariposa that publish a rate range 4 of 5 serving utilities: 2.9 to 21.1¢/kWh, a spread kept separate from the state average.
Mariposa, California shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. For Mariposa, California, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. Grid carbon intensity for Mariposa, via its balancing authority, is 369.346 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Mariposa at 19.64 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Mariposa, about 43,176 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Mariposa figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Mariposa, California qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Mariposa, California turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Mariposa, California traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.