For Glenn, California, the public grid picture begins with its place in the CAISO market (California Independent System Operator) and the infrastructure mapped inside the county. Grid access across Glenn tops out at 500 kV, over a footprint of 14 mapped substations. In Glenn, 2 utilities share the retail territory, among them PACIFIC GAS & ELECTRIC CO., WAPA-- WESTERN AREA POWER ADMINISTRATION.

Grid position at a glance

Serving utilities
PACIFIC GAS & ELECTRIC CO., WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
CAISO (California Independent System Operator)
Highest grid access
500 kV
Substations in county
14
Industrial retail rate
21.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 serving utilities: 2.9 to 21.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
369 lb CO2/MWh
Water withdrawals
666 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
15,947 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Glenn

This page gathers the public grid evidence for Glenn, California that bears on a large new load. The highest mapped voltage in Glenn is 500 kV, in the high-voltage transmission class. Glenn carries 14 substations in the mapped layer, spread across the county.

For Glenn, the CAISO market (California Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 21.6 cents per kWh, drawn from EIA-861 and applied to Glenn at the state level rather than as a county rate. The serving utilities in Glenn that publish a rate range 2 serving utilities: 2.9 to 21.1¢/kWh, a spread kept separate from the state average.

For Glenn, California, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Glenn, California in the federal EIA-860M inventory, a measured zero rather than missing data. Grid carbon intensity for Glenn, via its balancing authority, is 369.346 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Glenn at 666.37 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Glenn, about 15,947 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Glenn figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Glenn, California qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Glenn, California turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Glenn, California traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.