Power by county

White, AR: data center power outlook

The grid around White, Arkansas is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside White the mapped layer shows 14 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across White is split among 4 utilities, among them ENTERGY ARKANSAS LLC, FARMERS ELECTRIC COOP CORP - (AR), FIRST ELECTRIC COOP CORP.

Grid position at a glance

Serving utilities
ENTERGY ARKANSAS LLC, FARMERS ELECTRIC COOP CORP - (AR), FIRST ELECTRIC COOP CORP, WOODRUFF ELECTRIC COOP CORP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
500 kV
Substations in county
14
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 4 serving utilities: 6.4 to 21.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
7 projects, 745 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
151 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
27,011 employed in construction within ~120 km (24 of 27 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in White

Read on for the public power picture of White in Arkansas, assembled for data center siting. At 500 kV, White carries high-voltage transmission at its strongest mapped point. White contains 14 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over White clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. White carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For White, the per-utility spread is 3 of 4 serving utilities: 6.4 to 21.7¢/kWh, which qualifies but never replaces the state average.

White carries 7 projects in the interconnection queue, totalling 745 MW of requested capacity. For White, Arkansas, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over White shows 981.982 lb CO2 per MWh.

For White, the USGS 2015 compilation records 150.7 million gallons per day of all-use freshwater withdrawals, not water available to a new load. White sits within commuting range of roughly 27,011 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for White here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for White, Arkansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in White, Arkansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for White, Arkansas are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources