Power by county

Poinsett, AR: data center power outlook

Poinsett, Arkansas is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Poinsett carries 10 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Poinsett spans 4 utilities, with CITY WATER AND LIGHT PLANT, CRAIGHEAD ELECTRIC COOP CORP, ENTERGY ARKANSAS LLC among those mapped.

Grid position at a glance

Serving utilities
CITY WATER AND LIGHT PLANT, CRAIGHEAD ELECTRIC COOP CORP, ENTERGY ARKANSAS LLC, MISSISSIPPI COUNTY ELECTRIC CO
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
500 kV
Substations in county
10
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 5.1 to 13.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
11 projects, 1,986 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
973 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
31,908 employed in construction within ~120 km (24 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Poinsett

The material below frames Poinsett, Arkansas for a prospective large load, drawing only on public sources. Grid access in Poinsett extends to 500 kV, a high-voltage line class. The mapped layer places 10 substations across Poinsett, a moderate density.

Interconnection over Poinsett runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Poinsett, the rate shown is the state industrial average of 6.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Poinsett that report an industrial rate span 4 serving utilities: 5.1 to 13.7¢/kWh, shown as context and never as the county rate.

The queue feeds show 11 projects for Poinsett, totalling 1,986 MW of requested capacity. Nothing is on file for Poinsett, Arkansas in EIA-860M as planned or under construction, which counts as a measured zero. Poinsett sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Poinsett withdrew 973.17 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 31,908 people are employed in construction within a 120 km commute of Poinsett (BLS QCEW), which frames staffing distance rather than free labour.

For Poinsett, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Poinsett, Arkansas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Poinsett, Arkansas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Poinsett, Arkansas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources