Lonoke, AR: data center power outlook

Lonoke sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Lonoke, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Lonoke holds 18 mapped substations and reaches 500 kV. Lonoke is covered by 3 retail service territories, including CITY OF NORTH LITTLE ROCK - (AR), ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP.

Grid position at a glance

Serving utilities
CITY OF NORTH LITTLE ROCK - (AR), ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
500 kV
Substations in county
18
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 serving utilities: 6.4 to 9.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
19 projects, 3,361 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
952 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
26,261 employed in construction within ~120 km (25 of 27 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Lonoke

Below, Lonoke in Arkansas is described from public data as a starting point for siting diligence. Lonoke reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 18 substations mapped, Lonoke has a moderate spread of interconnection points.

Lonoke falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Lonoke is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Lonoke, reported per-utility industrial rates cover 3 serving utilities: 6.4 to 9.8¢/kWh, offered only as context beneath the state figure.

Lonoke has 19 interconnection-queue projects on record, totalling 3,360.5 MW of requested capacity. Nothing is on file for Lonoke, Arkansas in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Lonoke carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Lonoke are 951.86 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Lonoke, some 26,261 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Lonoke are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Lonoke, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Lonoke, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Lonoke, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources