Power by county

Lee, AR: data center power outlook

For Lee, Arkansas, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Lee tops out at 500 kV, over a footprint of 7 mapped substations. In Lee, 4 utilities share the retail territory, among them COAHOMA ELECTRIC POWER ASSN, ENTERGY ARKANSAS LLC, ENTERGY MISSISSIPPI LLC.

Grid position at a glance

Serving utilities
COAHOMA ELECTRIC POWER ASSN, ENTERGY ARKANSAS LLC, ENTERGY MISSISSIPPI LLC, WOODRUFF ELECTRIC COOP CORP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
500 kV
Substations in county
7
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 4 serving utilities: 6.4 to 21.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
16 projects, 2,595 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
336 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
29,121 employed in construction within ~120 km (23 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Lee

This page gathers the public grid evidence for Lee, Arkansas that bears on a large new load. The highest mapped voltage in Lee is 500 kV, in the high-voltage transmission class. Lee carries 7 substations in the mapped layer, spread across the county.

For Lee, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 6.7 cents per kWh, drawn from EIA-861 and applied to Lee at the state level rather than as a county rate. The serving utilities in Lee that publish a rate range 2 of 4 serving utilities: 6.4 to 21.7¢/kWh, a spread kept separate from the state average.

On record for Lee are 16 interconnection-queue projects, totalling 2,595 MW of requested capacity. For Lee, Arkansas, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. Grid carbon intensity for Lee, via its balancing authority, is 981.982 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Lee at 335.8 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Lee, about 29,121 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Lee figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Lee, Arkansas qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Lee, Arkansas turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Lee, Arkansas traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.

Sources