Power by county
Columbia, AR: data center power outlook
Columbia sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Columbia, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Columbia holds 12 mapped substations and reaches 500 kV. Columbia is covered by 4 retail service territories, including CLAIBORNE ELECTRIC COOP, INC, ENTERGY ARKANSAS LLC, ENTERGY LOUISIANA LLC.
Grid position at a glance
- Serving utilities
- CLAIBORNE ELECTRIC COOP, INC, ENTERGY ARKANSAS LLC, ENTERGY LOUISIANA LLC, SOUTHWEST LOUISIANA E M C
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 500 kV
- Substations in county
- 12
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 4 serving utilities: 6.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 9 projects, 1,677 MW
- Proposed generation
- 100 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 4.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 14,517 employed in construction within ~120 km (23 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Columbia
Everything here about Columbia, Arkansas comes from public federal and state records, with the gaps left visible. Columbia reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 12 substations mapped, Columbia has a moderate spread of interconnection points.
Columbia falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Columbia is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Columbia, reported per-utility industrial rates cover 1 of 4 serving utilities: 6.4¢/kWh, offered only as context beneath the state figure.
Columbia has 9 interconnection-queue projects on record, totalling 1,677 MW of requested capacity. Columbia has 100 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Columbia carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Columbia are 4.58 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Columbia, some 14,517 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Columbia are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Columbia, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Columbia, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Columbia, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.