Power by county
Cochise, AZ: data center power outlook
The grid around Cochise, Arizona is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Cochise the mapped layer shows 26 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Cochise is split among 8 utilities, among them AJO IMPROVEMENT CO, ARIZONA PUBLIC SERVICE CO, COLUMBUS ELECTRIC COOP, INC.
Grid position at a glance
- Serving utilities
- AJO IMPROVEMENT CO, ARIZONA PUBLIC SERVICE CO, COLUMBUS ELECTRIC COOP, INC, GRAHAM COUNTY ELECTRIC COOP INC, SULPHUR SPRINGS VALLEY E C INC, TOHONO O'ODHAM UTILITY AUTHORITY, USBIA-SAN CARLOS PROJECT, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 345 kV
- Substations in county
- 26
- Industrial retail rate
- 8.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 8 serving utilities: 1.9 to 15.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 600 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,621 lb CO2/MWh
- Water withdrawals
- 241 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 2,356 employed in construction within ~120 km (2 of 3 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Cochise
The sections below set out what public data shows about siting a large electrical load in Cochise, Arizona. At 345 kV, Cochise carries high-voltage transmission at its strongest mapped point. Cochise contains 26 mapped substations, a dense footprint that spreads interconnection options across many points.
Cochise, Arizona lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Cochise carries the state industrial average retail rate of 8.1 cents per kWh from EIA-861, applied statewide. For Cochise, the per-utility spread is 4 of 8 serving utilities: 1.9 to 15.7¢/kWh, which qualifies but never replaces the state average.
For Cochise, Arizona, no queued project appears in the feeds currently covered. In Cochise, 600 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Cochise shows 1,621.219 lb CO2 per MWh.
For Cochise, the USGS 2015 compilation records 240.85 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Cochise sits within commuting range of roughly 2,356 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Cochise here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Cochise, Arizona settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Cochise, Arizona requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Cochise, Arizona are logged directly below, so each figure on this page can be traced back to its public dataset.