Jackson, AL: data center power outlook

The grid around Jackson, Alabama is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Jackson the mapped layer shows 45 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Jackson is split among 7 utilities, among them ALABAMA POWER CO, CITY OF HUNTSVILLE - (AL), CITY OF SCOTTSBORO.

Grid position at a glance

Serving utilities
ALABAMA POWER CO, CITY OF HUNTSVILLE - (AL), CITY OF SCOTTSBORO, GEORGIA POWER CO, NORTH ALABAMA ELECTRIC COOP, SAND MOUNTAIN ELECTRIC COOP, SEQUACHEE VALLEY ELECTRIC COOP
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
45
Industrial retail rate
7.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 of 7 serving utilities: 5.0 to 8.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
200 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
641 lb CO2/MWh
Water withdrawals
376 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
48,925 employed in construction within ~120 km (36 of 37 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Jackson

The sections below set out what public data shows about siting a large electrical load in Jackson, Alabama. At 500 kV, Jackson carries high-voltage transmission at its strongest mapped point. Jackson contains 45 mapped substations, a dense footprint that spreads interconnection options across many points.

No organized wholesale market covers Jackson, Alabama, so capacity moves through the local utility and bilateral agreements. Jackson carries the state industrial average retail rate of 7.7 cents per kWh from EIA-861, applied statewide. For Jackson, the per-utility spread is 5 of 7 serving utilities: 5.0 to 8.4¢/kWh, which qualifies but never replaces the state average.

Jackson, Alabama has nothing in the interconnection queue across the feeds covered here, quiet or uningested. In Jackson, 200 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Jackson shows 641.018 lb CO2 per MWh.

For Jackson, the USGS 2015 compilation records 375.99 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Jackson sits within commuting range of roughly 48,925 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Jackson here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Jackson, Alabama settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Jackson, Alabama requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Jackson, Alabama are logged directly below, so each figure on this page can be traced back to its public dataset.