Power by county
Coffee, AL: data center power outlook
The grid around Coffee, Alabama is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Coffee the mapped layer shows 28 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Coffee is split among 6 utilities, among them ALABAMA POWER CO, CITY OF ELBA - (AL), COVINGTON ELECTRIC COOP, INC.
Grid position at a glance
- Serving utilities
- ALABAMA POWER CO, CITY OF ELBA - (AL), COVINGTON ELECTRIC COOP, INC, PEA RIVER ELECTRIC COOP, SOUTH ALABAMA ELEC COOP, INC, WIREGRASS ELECTRIC COOP, INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 28
- Industrial retail rate
- 7.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 8.0 to 11.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- No eGRID rate published for this balancing authority
- Water withdrawals
- 14 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 21,329 employed in construction within ~120 km (21 of 23 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Coffee
Read on for the public power picture of Coffee in Alabama, assembled for data center siting. Transmission-class access reaches 230 kV in Coffee at its strongest mapped point. Coffee contains 28 mapped substations, a dense footprint that spreads interconnection options across many points.
No organized wholesale market covers Coffee, Alabama, so capacity moves through the local utility and bilateral agreements. Coffee carries the state industrial average retail rate of 7.7 cents per kWh from EIA-861, applied statewide. For Coffee, the per-utility spread is 4 of 6 serving utilities: 8.0 to 11.0¢/kWh, which qualifies but never replaces the state average.
For Coffee, Alabama, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Coffee, Alabama, a real zero rather than a gap. The balancing authority over Coffee, Alabama has no eGRID output rate, so carbon intensity is absent rather than estimated.
For Coffee, the USGS 2015 compilation records 13.54 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Coffee sits within commuting range of roughly 21,329 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Coffee here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Coffee, Alabama settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Coffee, Alabama requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Coffee, Alabama are logged directly below, so each figure on this page can be traced back to its public dataset.